We use cookies to allow us and selected partners to improve your experience and our advertising. By continuing to browse you consent to our use of cookies. You can understand more and change your cookies preferences here.

Coronavirus Read our latest advice

Endorsed by

Which

?

Trusted Traders

Pryor Plumbing & Heating Ltd

Profile thumb 11 6 ad logo concept 01  1

5.0

41 Reviews

About

Welcome to Pryor, specialist bathroom fitters and suppliers based in Sheffield. We provide a range of bathroom products of the highest quality, guaranteed to last you for years to come. Our variety of products are the perfect fit for any style of bathroom, with a professional team that will help you along your bathroom journey.

To keep the entire process running smoothly, we provide the complete service from start to finish: all the way from design, to covering the full installation such as plastering, joinery, electrics and tiling. Saving you the time and stress of having to find another tradesman.

As we are Gas Safe Registered we are able to advise and carry out installation requirements to improve your hot water performance if required, such as installing a new boiler or pressurized unvented hot water cylinder.

What we do

  • Plumbers

    • Unvented cylinder installation and maintenance
  • Bathroom fitters

    • Accessible bathrooms and showers
    • Bathroom design services
    • Bathroom refurbishment
    • Bathroom suppliers
    • Wet rooms
  • Boiler, central heating and gas engineers

    • Boiler installation
    • Gas cooker installation
    • Gas safety testing and inspection
    • Power flushing
    • Radiators and central heating
  • More Services

    • showroom open mon-thurs 10-4 sat 10-3

Customer reviews

5.0
41 reviews
Customer Service
5.0
Quality
5.0
Value
4.9
Which? Local Review
Customer Service
Quality
Value
Corgi Registered Checked central heating system and radiators. Replaced damaged thermostat and valve on malfunctioning radiator. Quick efficient tidy and polite.
Ann Ravi Posted on 11/03/2009 , work completed 11/03/2009