Preparation of the areas and room: cover the flooring with cotton dust sheets and polythene sheeting placed over any items remaining in the room. Remove skirting boards and damp plaster: remove skirting boards, and gently chip off the damp defective plaster to approx 1.1 meters. Dispose and remove of all waste. Prepare surfaces: as per our specification and manufacturers guidelines, prepare all surfaces and prime them ready for damp proofing membranes. DAMP PROOFING Drill and Inject: carefully drill and inject a chemical DPC to the Internal wall. Supply and Install: as per our specification and manufacturers guidelines, Newton 805 mesh cavity damp proofing membrane to the walls. SPECIALIST RE-PLASTERING Supply and apply: all plastering and any preparatory materials and conduct re-plastering works over 2 stages using a two coat backing render, finished with a thistle gypsum plaster skim applied over the top, leaving a small gap at the base of the walls of 20-25mm RE-INSTATEMENT WORKS Supply & Fit: Re-instate skirting boards, shelving and radiators to original position. This is to be undertaken in strict accordance with our specification so as not to damage and void the damp proofing system.