Very poor installation, below normal industry standards according to RISA inspectors, and still problems remaining after remedial work.
Problems arose during the installation of windows and doors and is still ongoing 17 months on. Dan tried to fill in a ventilation grill under one door, and argued and shouted at me when I said that this was against Building Regulations. Later I found that he had filled in a ventilation brick under another door. Huge cracks appeared under the upper bay windows. One of the windows leaked, but this wasn't fixed until 6 months later. RISA, who do inspections for FENSA did an independent inspection, and they said the installation was below normal industry standards. They said the cracks were due to incorrect support during installation. The architraves and trims were of different sizes, tiles were broken, and pointed out other damage. 20 of the glass units were installed incorrectly with the low e coating on the wrong side. Plastering was inadequate. I pointed out that they had put a glass unit with toughened glass in wrong place. Several visits were required to do the remedial work. I reported I had tripped over the new kitchen door threshold. I arranged for a reinspection which again stated that the work was below industry standards. The plaster work was still inadequate, one glass unit was still wrong way round, door seal inadequate, caulking has shrunk between plaster and UPVC, steps need to be constructed to prevent trip hazard, soffit above upper bay needs mending. Latest Britelite letter omits mention of the steps. I am very distressed by the poor workmanship.